Tuesday, May 12, 2015

Week 7 Lab

During the lab period, Dana and Meghan went to the Drexel Machine Shop to get more holes drilled into the poles, since the power drill stopped working the night before. While they were there, Anna developed ideas on how to do the testing for the loudspeaker stand. After the Machine Shop, the group started putting the brackets on the poles to attach them to the bottom base. There was a problem with how close one of the holes were drilled, so Dana and Meghan had to drill a bigger hole so that the screw and bracket would fit correctly. All three poles were added to the bottom base by the end of the class.

No comments:

Post a Comment