Tuesday, May 19, 2015

Week 8 Pre Lab

The team met up the night before lab to completely finish building the stand. The top plate was drilled and attached. All of the screws, nuts and bolt connecting all of the components of the stand were tightened. The team decided that it would be impractical to bring the stand back and forth between the lab and dorms, so it was decided that the stand would remain in the Resident Hall.

No comments:

Post a Comment